Facility Design & Compliance Review

Right from the drawing board to the hospital floor

Independent review of hospital designs and existing facilities against JCI, NABH and Indian statutory requirements, for new builds, operating hospitals and renovations.

Three ways we help

New Construction – Drawing and design review before construction begins, so findings are resolved on paper, not on site.

Existing Hospitals – On-site facility assessment of your operating hospital against accreditation standards, with a prioritised gap report and corrective action plan.

Renovation & Expansion – Compliance-led planning for upgrading OTs, ICUs, CSSD, isolation rooms or adding new blocks, with minimal disruption to patient care and no surprises at survey.

Facility Design Compliance Review

Why review early?

Most facility findings trace back to design decisions: clean–dirty crossings, missing isolation anterooms, poorly zoned air handling, badly sited gas and fire systems. Caught at design or planning stage, they cost little to fix. Found at survey, they cost time, money and clinical downtime.

Looking to start your accreditation journey? AccreHealth Solutions is here to guide you

Online Support

+91 6282 341 473

What we review

Planning & Architecture

Zoning, adjacencies, patient and material flows

HVAC & Infection Control

Pressure cascades, air changes, filtration

Fire & Life Safety

Compartmentation, alarms, sprinklers, evacuation

Electrical & ELV

Critical power, isolated power, nurse call, security

Water, Plumbing & Waste

Water treatment, Legionella control, biomedical waste

Medical Gases

MGPS, LMO siting, alarms, gas scavenging

How it works

  1. Scope: we agree the project stage and areas under review
  2. Review: drawings, documents and, for existing facilities, a site walkthrough
  3. Findings meeting: discussed with your management, engineers and consultants
  4. Compliance report: risk-rated findings with clear corrective actions
  5. Closure support: re-review and verification through to handover or survey

Why AccreHealth

Led by a senior JCI surveyor with 15+ years and 200+ JCI projects

Reviews from the surveyor’s viewpoint: what will be seen and tested on survey day

Deep knowledge of Indian codes: NBC 2016, IS codes, PESO, BMW Rules

Building, upgrading or preparing for survey?

Tell us your project stage and bed capacity. We will respond with a scope and proposal.

Explore Our Other Services

AI-Driven Transformation in Healthcare
Laboratory Consulting Services